Environmental Consultancy for Planning Applications

The approval of a project goes far beyond architectural drawings and visual designs. Environmental considerations are one of the most critical factors assessed by planning authorities in Ireland.
Engaging environmental consultants early in the planning process is essential. It not only demonstrates a genuine commitment to environmental protection but also helps save time and reduce project costs. By being part of the design team from the outset, environmental issues can be resolved at preliminary stages, avoiding delays and strengthening the success of a planning application.
Avoid Delays with Early Environmental Input
Early involvement ensures that Environmental Impact Assessment (EIA) Screening requirements are addressed in line with the EIA Directive (2014/52/EU), as transposed into Irish law, and the EPA Guidelines on the Information to be Contained in Environmental Impact Assessment Reports (2022). This proactive approach helps identify whether a project is likely to have significant effects on the environment and whether a full Environmental Impact Assessment is required.
For clients, this means compliance with Irish planning legislation and a smoother, more resilient planning process, avoiding costly surprises further down the line.
Key Environmental Considerations
Important factors such as flood risk, waste management, and construction-phase impacts must also be assessed and addressed. Our team provides clear, practical reports that satisfy both planning and environmental regulations, supporting clients and planning authorities alike.
A Strategic Advantage for Clients
Considering environmental aspects from day one is not just about compliance; it is a strategic advantage. Early input from experienced consultants provides clarity, reduces risks, and strengthens the overall planning application.
ORS Environmental Services for Planning Applications
Our Environmental team provides a wide range of consultancy services to support successful planning applications, including:
• Environmental Impact Assessment Screening / Report (EIA)
• Appropriate Assessment / Natura Impact Statement (AA/NIS)
• Construction Environmental Management Plan (CEMP)
• Operational Waste Management Plan (OWMP)
• Resource & Waste Management Plan (RWMP)
• Stage 1 / 2 Site Specific Flood Risk Assessment (SSFRA)
• Environmental Clerk of Works (EnvCoW)
• Environmental Due Diligence
Talk to Our Team
If your business requires environmental consultancy for planning applications, contact us at info@ors.ie or call +353 1524 2060. Learn more about our Environmental services and how we can help guide your project from planning through to delivery.