Case Studies

IDA Blanchardstown

TEAM

ORS Multidisciplinary Team

Sector

Services Provided

Project management, infrastructure, civil structural,
flood risk assessment and PSDP

Overview of service

IDA Ireland is the government agency responsible for attracting and retaining inward foreign direct investment into Ireland.

IDA Ireland appointed ORS as employer representative and lead designer for the 350-meter extension of an existing access road within the IDA College Business and Technology Park, Blanchardstown, Co Dublin.

ORS also acted as PSDP and the employer representative, coordinating a complete procurement process for site investigations and successfully securing planning permission for the project.

Screenshot 2023 02 13 at 10.25.00
Farran Mullingar
Screenshot 2023 02 13 at 10.25.00
There were four distinct phases:
  • Stage 1 – Initial Stage: Evaluation of current planning drawings. Undertaking site investigation reports. Flood risk assessment to determine the level of flood risk. Preliminary bridge/culvert design. OPW application documentation (section 50 application). Preparation of initial financial costings for the project.
  • Stage 2 – Planning stage: Preparation of the planning application and all associated drawings and documentation, liaison with all relevant parties and stakeholders, preparation of budget costings, performing the role of PSDP, including the production of a planning stage preliminary health and safety plan, review of planning conditions and incorporation of same into the planning drawings.
  • Stage 3 – Design/tender stage: Detailed design of the proposed roadway and bridge/culvert, PSDP duties, preparation of a project programme and tender budget estimate, identification of key project milestones, preparation of tender issue documents and management of the tender process.
  • Stage 4 – Construction stage: Undertake the role of employer’s representative, manage the works programme from commencement to completion, management of the successful contractor, attendance at site meetings, and certification of costs throughout the project lifecycle, including liaising with the client regularly to provide updates.
Group 4987
Castleforbes 3
Screenshot 2023 02 13 at 10.25.00

Project challenges

Clever design and communication

The challenges faced in this project were largely around the existing civil services already on site. As part of the new road design, new foul and storm lines were needed to accommodate future expansion within the business park.

The existing services in the ground, which included electrical, public lighting, gas and telecoms lines, created a very congested environment underground; the ORS civil engineering team designed around all these existing services.

During the construction stage, extra care was needed by the contractor to ensure the existing services were not damaged or interfered with throughout the works. Strong project management and communication between the design team and contractor ensured the project was completed on time and under budget.

Leads

Key Contacts

  • Darren Holmes Director
    Group 8501 2
    View Bio
    Darren Holmes

    Director

  • James Hamilton
    Group 8501 2
    View Bio
    James Hamilton

    Joint Project Management Lead

  • Gary Dolan
    Group 8501 2
    View Bio
    Gary Dolan

    Joint Project Management Lead

  • Charter Medical Refurbishment

    ORS delivered multidisciplinary services for the internal refurbishment and fit-out of the Alverna Ward in Mullingar, Co. Westmeath.

    Project Management

    View project
  • Glenavon House Project, Glasnevin

    Glenavon Developments Ltd. appointed ORS to deliver multidisciplinary services for The Glenavon House project in Glasnevin, Dublin 9.

    Project Management

    View project
  • Franklin Pharmaceuticals

    Franklin Pharmaceuticals commissioned ORS to manage the planning application coordination and submission for a site extension and development.

    Project Management

    View project
  • South Point Business Park

    ORS was the lead design consultant for Winterbrook’s South Point Business Park development in Rathnew, Co. Wicklow.

    Project Management

    View project
  • Tesco Expansion Project

    Tesco Ireland engaged ORS to provide multidisciplinary services in the procurement and renovation of its stores nationwide.

    Project Management

    View project
  • IDA Blanchardstown

    IDA Ireland appointed ORS as the employer representative and lead designer for the extension of an access road within the IDA College Business and Technology Park in Blanchardstown, Co Dublin.

    Project Management

    View project
  • PalletXpress Distribution Centre

    PalletXpress appointed ORS to provide project management, civil & structural, fire, disability access, PSDP and assigned certifier services on the construction of a new warehouse and distribution centre.

    Project Management

    View project

Talk to A specialist

Great projects start with great relationships. Have a project in mind? Contact us.

Contact us

Block A, Marlinstown
Business Park, Mullingar,
Co.Westmeath, Ireland.
N91 W5NN

Pembr, 127 Baggot Street Lower, Baggotrath Dublin, D02 F634

Portershed,
Eyre Square,
Galway,
H91 HY51

Office 4, Spencer House,
High Road, Letterkenny,
Co. Donegal,
Ireland. F92 PX8N

Republic of Work,
12 S Mall,
Centre, Cork,
T12 RD43

ORS has satellite offices in Newry and Maynooth.

Back to Top