Case Studies

Charter Medical Refurbishment Refurbishment

TEAM

ORS Multidisciplinary Team

Sector

Services Provided

Project management, structural engineering, assigned and design certifier and PSDP

Overview of service

Charter Medical represents excellence in the highest clinical standard of patient care. It provides both public and private healthcare services ranging from specialist consultancy care and an injuries clinic.

ORS was appointed to provide multidisciplinary services for the internal refurbishment and fit-out of the Alverna Ward in Mullingar, Co. Westmeath. The works included stripping out the existing floor and ceilings in the ward and demolishing some internal walls to merge existing rooms and form an endoscopy theatre. ORS project managed the design team to include architectural, structural engineering, fire safety and disability access consultancy, assigned and design certifier and PSDP.

Before work commenced, a fire risk assessment (FRA) was carried out to determine the key areas that needed to be remediated in compliance with current building standards. The FRA concluded that a revised fire certificate application was required and subsequently prepared by specialist fire engineers.

Screenshot 2023 02 13 at 10.25.00
Farran Mullingar
Screenshot 2023 02 13 at 10.25.00

Mechanical and electrical design was an important part of this project. In the role of design certifier, ORS worked in close collaboration with the M&E designer. To meet the infection control requirements, the endoscopy theatres required specialised gas lines within the rooms for the procedural work and negative pressure room control.

Working with Charter Medical on this project exemplifies how ORS delivers complex multidisciplinary solutions. It involved appointing a project coordinator as the client’s single point of contact. The result of the extensive and specialist work allows the client to offer enhanced medical services in the region.

Group 4987

Castleforbes 3
Screenshot 2023 02 13 at 10.25.00

Project challenges

Collaboration

This project needed to be completed in a very tight timeframe. There was only a small window within the hospital’s operating schedule which would allow for this ward to be unoccupied when the construction works were carried out. Also, due to the age of the building, detailed as-constructed drawings were not available; therefore, it was difficult to understand what impact the demolition works would have on the building structurally.

The timeframe was managed by working closely with the client and the contractor. Project meetings were held weekly, and clearly defined communication channels were kept throughout the project. When dealing with the fire safety certificate application, it was decided to submit the FSC under a seven-day notice as the project timeline would not allow the FSC to be granted through the conventional route.

In the absence of structural engineering drawings for the existing building, our structural engineers conducted a detailed site survey which included some invasive work carried out by the contractor. This allowed our engineer to gather the required information about the existing building and ensure that the detailed design of the proposed structural elements was robust with no assumptions made.

Leaders

Key Contacts

  • Darren Holmes Director
    Group 8501 2
    View Bio
    Darren Holmes

    Director

  • James Hamilton
    Group 8501 2
    View Bio
    James Hamilton

    Joint Project Management Lead

  • Gary Dolan
    Group 8501 2
    View Bio
    Gary Dolan

    Joint Project Management Lead

  • Charter Medical Refurbishment

    ORS delivered multidisciplinary services for the internal refurbishment and fit-out of the Alverna Ward in Mullingar, Co. Westmeath.

    Project Management

    View project
  • Glenavon House Project, Glasnevin

    Glenavon Developments Ltd. appointed ORS to deliver multidisciplinary services for The Glenavon House project in Glasnevin, Dublin 9.

    Project Management

    View project
  • Franklin Pharmaceuticals

    Franklin Pharmaceuticals commissioned ORS to manage the planning application coordination and submission for a site extension and development.

    Project Management

    View project
  • South Point Business Park

    ORS was the lead design consultant for Winterbrook’s South Point Business Park development in Rathnew, Co. Wicklow.

    Project Management

    View project
  • Tesco Expansion Project

    Tesco Ireland engaged ORS to provide multidisciplinary services in the procurement and renovation of its stores nationwide.

    Project Management

    View project
  • IDA Blanchardstown

    IDA Ireland appointed ORS as the employer representative and lead designer for the extension of an access road within the IDA College Business and Technology Park in Blanchardstown, Co Dublin.

    Project Management

    View project
  • PalletXpress Distribution Centre

    PalletXpress appointed ORS to provide project management, civil & structural, fire, disability access, PSDP and assigned certifier services on the construction of a new warehouse and distribution centre.

    Project Management

    View project

Talk to A specialist

Great projects start with great relationships. Have a project in mind? Contact us.

Contact us

Block A, Marlinstown
Business Park, Mullingar,
Co.Westmeath, Ireland.
N91 W5NN

Pembr, 127 Baggot Street Lower, Baggotrath Dublin, D02 F634

Portershed,
Eyre Square,
Galway,
H91 HY51

Office 4, Spencer House,
High Road, Letterkenny,
Co. Donegal,
Ireland. F92 PX8N

Republic of Work,
12 S Mall,
Centre, Cork,
T12 RD43

ORS has satellite offices in Newry and Maynooth.

Back to Top