The ORS team identified the need for solid design and background information to support the delivery of the works. The team was responsible for preparing and managing site investigations works packages which fed into the overall designs of each stop.
The team was also responsible for developing the complete design package to inform the construction of the bus stops. This involved the preparation of detailed design drawings, specifications, tender documentation, tender assessment, site supervision and contract administration for the construction of the works.