The main challenge of the development plan was to ensure that the traffic impacts associated with the day-to-day activity of the development were minimised. Managing that impact will result in a wide range of benefits to its daily operation and the wider community.
Traffic profiles likely to be generated by the entire site, including the residential units and the student accommodation, were obtained and split through the surrounding junctions in proportion to the existing traffic flows.
Analysing the access route also included mitigation measures to improve the overall capacity and reduce existing delays. The development also incorporated a significant neighbouring development which added to the complexity of the analysis carried out.
Due to the large scale of the development, the ORS Infrastructure Team proposed to establish a phasing approach to meet these challenges.
There were existing main foul and storm sewer lines that needed to be diverted across the site to facilitate the new development. This brought challenges that were overcome by ensuring correct gradients on pipe networks and obtaining statutory consent and approval to divert these lines.