![Screenshot 2023 02 13 at 10.25.00](https://ors.ie/wp-content/uploads/2023/02/Untitled-1.png)
![Farran Mullingar](https://ors.ie/wp-content/uploads/2023/02/Metrolink2-1.jpg)
![Screenshot 2023 02 13 at 10.25.00](https://ors.ie/wp-content/uploads/2023/02/Untitled-1.png)
The ORS Building Surveying Team surveyed the selected properties and advised on their current condition and susceptibility to damage from vibration and other construction-related works. As part of the work, ORS developed tailor-made reports and templates to suit the client’s needs to provide easy-to-navigate information relating to numerous properties.
Part of the survey scope was also to understand if the as-built building reflected the approved planning documentation. ORS undertook planning searches and provided a complete overview of each property to TII to allow for considerations as part of the design and programme.
![Group 4987](https://ors.ie/wp-content/uploads/2023/02/Group-4987.png)