


Project Outcome
The project was successfully delivered on programme and under budget through close collaboration between the client, contractor and wider design team. Our proactive approach throughout the design and construction phases helped maintain programme certainty while supporting efficient project delivery.
A bespoke structural engineering solution was developed to reflect the actual operational loading requirements of the facility, rather than relying on conservative standard assumptions. This approach optimised material use, reduced embodied carbon and delivered a more sustainable, cost-effective structural design while meeting the operational needs of the client.







