Project Outcome
ORS successfully delivered a full underground infrastructure survey, completed risk-prioritised integrity testing, and managed all project phases with minimal operational disruption. All testing was conducted in accordance with Appendix D of the “IPC Guidance Note: Guidance Note on Storage and Transfer of Materials for Scheduled Activities” (2004). This guidance addresses the design, construction, operation, maintenance and testing of pipelines.
The result was a comprehensive technical compliance report, register and network map ready for EPA submission, ensuring the data centre remains fully compliant with IE License conditions. Key outcomes of the project included:
This project set the industry standard for cost-effective environmental compliance practices across similar facilities.