Case Studies

Compliance for the Pharma Industry

TEAM

Environmental Management Team

Sector

Services Provided

Integrity Testing, EPA licensing

Overview of service

The EPA outline their obligation in relation to environmental licensing in the following:

“Certain industrial activities produce emissions of various substances into the air, water and land. They also generate waste and use resources such as energy and water. The EPA has a wide remit and is responsible for a range of tasks relating to the authorisation of activities that could have an impact on the environment or on human health.” (www.epa.ie)

At ORS, we have clients who are licensed by the EPA across a range of industries, from pharmaceutical to heavy industry to waste management in Ireland and the UK. Ensuring adherence that company policy procedures are aligned with and ultimately comply with the conditions of their licence is a crucial focus for our clients.

We offer a wide range of environmental compliance services which include:

  • Environmental monitoring – noise, air, water
  • Annual Environmental Reporting
  • Environmental Liabilities Risk Assessment 
  • Closure Restoration & Aftercare Management Plan
  • Waste Classification Reporting
  • Integrity testing
Screenshot 2023 02 13 at 10.25.00
Farran Mullingar
Screenshot 2023 02 13 at 10.25.00
Integrity Testing

In general, the condition relating to integrity testing in a licence will be worded similarly to the following:

“The integrity and water tightness of all underground pipes, tanks, bunding structures and containers and their resistance to penetration by water or other materials carried or stored therein shall be tested and demonstrated by the licensee. This testing shall be carried out by the licensee at least once every three years and reported to the Agency on each occasion. This testing shall be carried out in accordance with any guidance published by the Agency. A written record of all integrity tests and any maintenance or remedial work arising from them shall be maintained by the licensee.”

Standards

The following guidance documents are considered in the integrity testing of bunds and underground services:

  • EPA, (2004): IPC Guidance Note on Storage and Transfer of Materials for Scheduled Activities 
  • BS 8007:1987: Design of Concrete Structures for Containing Aqueous Liquids 
  • CIRIA Report 163: Construction of bunds for oil storage tanks 
  • IS EN 1610: Construction and Testing of Drains and Sewers

A tailored suite of testing is prepared following a risk assessment of the assets to be tested. Visual, Hydrostatic and pneumatic testing techniques are used to ensure the integrity of all assets. All testing is carried out and signed off by a suitably qualified person.

ORS provide a bespoke service offering tailored to each site informed by a GAP analysis of the integrity testing programme and records.

Group 4987
Castleforbes 3
Screenshot 2023 02 13 at 10.25.00

Project challenges

Challenges which can be encountered include

Baselining

Baselining of the drainage networks to ensure asset registers are up to date and can act as a programme management aid

Co-ordination

Co-ordination of confined space works, for example, to carry out visual inspections of underground bunds

Reviewing

Reviewing remedial recommendations to determine the most cost-effective course of action for our clients.

Leaders

Key Contacts

  • John Brennan Managing Director
    Group 8501 2
    View Bio
    John Brennan

    Managing Director

  • Luke Martin
    Group 8501 2
    View Bio
    Luke Martin

    Associate and Joint Environmental Lead

  • N5 Westport to Turlough Road

    ORS was appointed to provide environmental consultancy services on this major road project managed by Mayo County Council’s National Roads Office (NRO).

    Environmental

    View project
  • Biogas Renewable Energy

    Local Power Ltd. engaged ORS to prepare an environmental impact assessment report in support of an application for planning permission for a 4MW Anaerobic Digestion Facility.

    Environmental

    View project
  • Fire-Water Risk Assessment & Testing

    ORS were appointed by Capital Homes in Q2 2018 to provide Civil and Structural services for a proposed residential development at Clara Road, Tullamore, Co. Offaly.

    Environmental

    View project
  • KSN Flood Risk Assessment

    KSN Horizon appointed ORS to carry out flood/climate risk and natural hazards risk assessments on several high-value properties in Dublin city centre.

    Environmental

    View project
  • Panda Fire Risk Assessment

    Panda appointed ORS to conduct fire risk assessments at several of its waste management facilities nationwide.

    Environmental

    View project
  • White Heart Lane Flood Risk Assessment

    Offaly County Council commissioned ORS to make a Section 50 application to the OPW for works at White Heart Lane in Portarlington, Co. Laois.

    Environmental

    View project
  • Compliance for the Pharma Industry

    ORS provides environmental consultancy services for a range of blue-chip clients within the pharmaceutical industry.

    Environmental

    View project

Talk to A specialist

Great projects start with great relationships. Have a project in mind? Contact us.

Contact us

Block A, Marlinstown
Business Park, Mullingar,
Co.Westmeath, Ireland.
N91 W5NN

Pembr, 127 Baggot Street Lower, Baggotrath Dublin, D02 F634

Portershed,
Eyre Square,
Galway,
H91 HY51

Office 4, Spencer House,
High Road, Letterkenny,
Co. Donegal,
Ireland. F92 PX8N

Republic of Work,
12 S Mall,
Centre, Cork,
T12 RD43

ORS has satellite offices in Newry and Maynooth.

Back to Top